CURRICULUM VITAE
JARED JOHN HALL
PERSONAL INFORMATION
Address 12 Hill road winkelspruit
Durban South Africa
Contact No+27795018341
Age 31
Sex Male
Birth Date17 February 1990
Marital StatusSingle
LanguagesEnglish & Afrikaans
Id No 9002175066080
Passport No A02472884
Email address deraj60@gmail.com
OTHER INFORMATION/INTERESTS
National Senior Certificate
Certified McELROYPolywelder
TFM Certificate Working at Heights and confined spaces, Slinging and rigging of pipes and machines.
EMPLOYMENT HISTORY
Casual jobs from 2008 to 2013
Worked at RHO-TECH 06/06/2013 – 27/06/2017 Retrenched due to lack of work coming in.
Duties included welding of HDPE pipelines and installation in different countries Namibia, DRC, Rwanda on projects for the Howard Buffet foundation. as well as South Africa.
90% of the projects I would run and supervise myself from start to finish, pipe sizes from 32mm OD to 900mm OD using McELROY fusion machines as a polywelder.
Above all I became so accustomed to the machinery and knowledge of HDPE systems, I Was sent to conduct training sessions for Mainline in Cape Town, as well as TFM in the DRC.
Mike Schutte +2779 497 8951 south African line
Email mike.schutte@rho-tech.co.za
I have a Letter of service if required
Worked as an HDPE trainer for Tenkefungurume mine over the course of 4months in 2017.
Duties included training and proper use of equipment, welding Parameters, Mechanical maintenance,Data logger usage and trouble shooting.
How to fuse HDPE correctly and more efficiently using MCELROY equipment as well as passing on knowledge I have obtained during my years in the field of working with HDPE.
Francis Naweji supervisor contact information
francisyavikum@tfm.cmoc.com
phone number work +243820001576 DRC LINE
Worked for Remote Group from 02/01/2019 to 13/03/2020.
Reason for leaving Retrenchment.
Employed as a HDPE welder and plumber foreman.
In charge of HDPE works which included managing a team,doing trench digging,pipe welding, pipe laying with correct river sand bedding around pipe then followed by backfilling with approved G7 For proper compaction, pressure testing and bolting up using correct bolt up procedures and installing of PVC,PPR,GI.HDPE and fittings such as air valves and gate valves.
I trained locals how to use the manual welding machines to weld.
Connected pipeline from lake raw water line connecting to buffer tank,which pumped to irrigation pivots and to a water treatment plant then to a buffer tank then supplied to buildings. As well as connecting waste water treatment plant together and HDPE pipeline from lift station to blivets.
I have a passion for HDPE pipe work in general, I pay attention to detail and have not had a failed weld to this day from 25mm OD TO 900mmm OD. Looking for new opportunities to apply my HDPE knowledge.
James blackman project manager contact information
Jblackman@mass-group.org email
+250 787 906 432 Rwandan Line
Poly welding Mine site experience
DRA 15km HDPE 315mm water supply line 2016 Elandsfontien phosphate mine
2016 McELROY tracstar 618
DRA dewatering project pipe sizes from 90mm OD 630mmOD
2016
Mc Elroy pitbull used from 90mm to 160mm
McElroy tracstar 618 used for pipe sizes from 180mm to 450mm
Mc Elroy tracstar t900 used to weld 630mm pipes
Tenkefungurume copper and cobalt mine
HDPE training on the job training 450mm 5km dewatering line
2017
Assmang Iron Ore mine
450mm OD 5km poly welding a continuous line after cutting and removing stub flange after every 12 meters as the pipe was leaking due to poor weld quality by the previous contactor 2018
CURRICULUM VITAE
JARED JOHN HALL
PERSONAL INFORMATION
Address 12 Hill road winkelspruit
Durban South Africa
Contact No+27795018341
Age 31
Sex Male
Birth Date17 February 1990
Marital StatusSingle
LanguagesEnglish & Afrikaans
Id No 9002175066080
Passport No A02472884
Email address deraj60@gmail.com
OTHER INFORMATION/INTERESTS
National Senior Certificate
Certified McELROYPolywelder
TFM Certificate Working at Heights and confined spaces, Slinging and rigging of pipes and machines.
EMPLOYMENT HISTORY
Casual jobs from 2008 to 2013
Worked at RHO-TECH 06/06/2013 – 27/06/2017 Retrenched due to lack of work coming in.
Duties included welding of HDPE pipelines and installation in different countries Namibia, DRC, Rwanda on projects for the Howard Buffet foundation. as well as South Africa.
90% of the projects I would run and supervise myself from start to finish, pipe sizes from 32mm OD to 900mm OD using McELROY fusion machines as a polywelder.
Above all I became so accustomed to the machinery and knowledge of HDPE systems, I Was sent to conduct training sessions for Mainline in Cape Town, as well as TFM in the DRC.
Mike Schutte +2779 497 8951 south African line
Email mike.schutte@rho-tech.co.za
I have a Letter of service if required
Worked as an HDPE trainer for Tenkefungurume mine over the course of 4months in 2017.
Duties included training and proper use of equipment, welding Parameters, Mechanical maintenance,Data logger usage and trouble shooting.
How to fuse HDPE correctly and more efficiently using MCELROY equipment as well as passing on knowledge I have obtained during my years in the field of working with HDPE.
Francis Naweji supervisor contact information
francisyavikum@tfm.cmoc.com
phone number work +243820001576 DRC LINE
Worked for Remote Group from 02/01/2019 to 13/03/2020.
Reason for leaving Retrenchment.
Employed as a HDPE welder and plumber foreman.
In charge of HDPE works which included managing a team,doing trench digging,pipe welding, pipe laying with correct river sand bedding around pipe then followed by backfilling with approved G7 For proper compaction, pressure testing and bolting up using correct bolt up procedures and installing of PVC,PPR,GI.HDPE and fittings such as air valves and gate valves.
I trained locals how to use the manual welding machines to weld.
Connected pipeline from lake raw water line connecting to buffer tank,which pumped to irrigation pivots and to a water treatment plant then to a buffer tank then supplied to buildings. As well as connecting waste water treatment plant together and HDPE pipeline from lift station to blivets.
I have a passion for HDPE pipe work in general, I pay attention to detail and have not had a failed weld to this day from 25mm OD TO 900mmm OD. Looking for new opportunities to apply my HDPE knowledge.
James blackman project manager contact information
Jblackman@mass-group.org email
+250 787 906 432 Rwandan Line
Poly welding Mine site experience
DRA 15km HDPE 315mm water supply line 2016 Elandsfontien phosphate mine
2016 McELROY tracstar 618
DRA dewatering project pipe sizes from 90mm OD 630mmOD
2016
Mc Elroy pitbull used from 90mm to 160mm
McElroy tracstar 618 used for pipe sizes from 180mm to 450mm
Mc Elroy tracstar t900 used to weld 630mm pipes
Tenkefungurume copper and cobalt mine
HDPE training on the job training 450mm 5km dewatering line
2017
Assmang Iron Ore mine
450mm OD 5km poly welding a continuous line after cutting and removing stub flange after every 12 meters as the pipe was leaking due to poor weld quality by the previous contactor 2018